The water quality standard of Huangshui River pollution control has made important initial results

October 19th, automatic monitoring station of water quality test results display station and Minhe Hui and Tu Autonomous County small Gorge Bridge water quality automatic monitoring water quality, water quality improved significantly in the Huangshui River section of Xining, reached three above water quality standards, Xining to the Eastern Sea reached four class standard. On the same day, vice governor Ma Shunqing rate provincial departments responsible for the progress of the prevention and control of water pollution investigation in Xining City, check the Huangshui River Basin in Haidong region, arrangements for the next phase of work. At the special meeting, Ma Shunqing said: "the Huangshui River water quality from the original severe pollution to four water now, reach the national water quality standard in the mainstream, marking the significant achievements of the Huangshui River pollution control."

since 2009, in the joint efforts of the nation and the strong support of the departments at all levels, Huangshui River Basin pollution control a total investment of about 1 billion 700 million yuan, along the Huangshui River Basin in the implementation of a number of pollution emission reduction projects. At present, along the Huangshui River basin there are 14 sewage treatment plants, sewage outfall of governance 730, renovation and new construction of sewage pipe network reached more than and 230 km, the new sewage treatment capacity of more than 110 thousand tons, up along the Huang River construction waste and garbage 21 thousand and 400 cubic meters, 125 thousand cubic meters of river silt cleaning, cleaning, rectifying and standardizing the river bank, mining battlefield 365, sand washing. The implementation of a number of corporate pollution control projects. After three years of concentrated poverty, Huangshui River water quality by the severe pollution in 2007 to moderate pollution in 2009, and then to the mild pollution in 2011, to mid October this year, the water quality of Huangshui River into 4 kinds of water quality, water quality standards in the country reached.

According to

, accompanied by Ma Shunqing, the person in charge of the provincial government office, the provincial development and Reform Commission, the Provincial Department of finance, provincial Environmental Protection Bureau and other relevant departments, has entered the Xining city sewage treatment plant, the east area of Xining City, the first third sewage treatment plants, Xining cooperation road pipe network restoration project construction site, Ning Hu North Shore sewage pumping station, a small Gorge Bridge automatic water quality monitoring station, the Ping’an County Ledu County, Xiaoxia south of the sewage outfall remediation project, Minhe County water quality automatic monitoring stations, a detailed understanding of the sewage outfall along the Huangshui intercepting sewer engineering facilities, field view of the sewage pipe network construction and operation of construction of sewage treatment plant.

subsequently, Ma Shunqing convened a special meeting of the people and the relevant departments. At the meeting, he fully affirmed the Huangshui River Basin water pollution control work in our province in the past three years of achievement, the important role of highly demonstrates the Huangshui River Basin in Qinghai in the economic and social development, and the next work requirements. He said, hope the Haibei Tibetan Autonomous Prefecture, Xining, Haidong region should pay close attention to the implementation of this year by intercepting sewer main pollution control projects, to ensure that most of the projects completed before the end of October, the completion of the project by the end of the individual. Strengthen the operation of sewage treatment plant, improve the level of management, strengthen personnel training, the sewage treatment plant has been built to achieve full load and standardized operation, to ensure that pollution control facilities investment to achieve the desired effect. Consolidate along the Huangshui River sand mining, washing out rectification work, the establishment of long-term mechanism;

Leave a Reply

Your email address will not be published. Required fields are marked *